Smart Grid Storage Playbook
How do grid-service requests meet power, energy, state-of-charge, frequency and voltage constraints?
Engineering approach
Active/reactive capability allocation, Volt-VAR, frequency-watt, ramp and multi-interval energy references.
Explainable grid-support references with explicit power, energy and operating limits.
Evidence inspector
- Source reference
caf54a81b4d76aa09a2ab8069d343c44e0e5467b· pinned historical snapshot- Reviewed at
- 2026-10-06T23:09:53.450Z
- Review scope
- Pinned repository documentation reviewed; upstream scientific tests not rerun here.
- Published checks
- The source documents dependency-free reference commands, unit tests and model-specific assumptions. These upstream checks were not rerun here.
- Next action
- Run a capability-allocation reference and inspect the model assumptions before using project data.
Source snapshot · 2026-10-06
Pinned source caf54a8 Published checks
What this does not establish
Educational reference, not a grid-code compliance determination, protection-setting approval, plant-controller specification or battery-warranty assessment.
Evidence associated with a tagged release or historical CI run does not automatically validate later commits. Review the exact source, environment and assumptions used for any reproduced result.
Read the shared evidence vocabulary →
Evidence snapshot
Reviewed 2026-11-12; evidence records retain their own scope and dates.
- Documentation snapshot
- 2026-10-06 · caf54a8 ·
caf54a81b4d76aa09a2ab8069d343c44e0e5467b - Portfolio source record
- 151 tests · 372 subtests · source-reported · 3ce0b4b ·
3ce0b4b2fd4af2bea743013eac2eee1042b6bdd3 - Current release
- Unknown from the reviewed evidence.
- Current verification
- Successful hosted run · 2026-11-04 · target
84f6c43aafb234c139152074888323f14993d4b2 - Repository head at 2026-10-17 inventory
caf54a81b4d76aa09a2ab8069d343c44e0e5467b· inventory snapshot only